National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Parking house of NPP Dukovany
Marečková, Andrea ; Rosendorf, Aleš (referee) ; Boleslavská, Yvona (advisor) ; Matějka, Libor (advisor)
The subject of the bachelor thesis is to solve the crisis situation of parking at the Dukovany Nuclear Power Plant. Parking areas in front of the company are still the same, but the number of cars is growing rapidly. Therefore, the power plant management decided to solve this situation. Two nearly identical parkades were designed for this area to cover the capacity of 1572 parking spaces. It is a simple design of a 5-storey prefabricated building made of reinforced concrete columns, beams, SPIROLL panels and other elements. For better bracing of the building, the vertical communication cores were designed as monolithic reinforced. The façade of the building consists of a suspended structure fitted with expanded metal, which will help with incoming light and also with the exchange of degraded air in the garages. On the first floor there is a parking space for 142 cars, of which 4 are parking stalls for charging electric cars and 10 stalls for designated handicap parking, all these stalls are located only on the ground floor for easier access of the car owners. In addition to these parking stalls, there are three vertical communication cores with staircases and elevators. At one communication core is also a sanitary facility with toilets for men, women, for people with disabilities and cleaning room. Two ramps are designed for vertical crossing of cars in the middle of the ground plan. Self-service washing boxes and utility room were designed according to requirements. The second and subsequent floors are identical. There are 161 parking stalls on each floor, 4 of them are for charging electric vehicles. There are also sanitary facilities and a utility room. For the safety of pedestrians, the entire parkade is marked with horizontal roads, thanks to which the employees get from their cars to the communication core and out of the building.
Parking house of NPP Dukovany
Marečková, Andrea ; Rosendorf, Aleš (referee) ; Boleslavská, Yvona (advisor) ; Matějka, Libor (advisor)
The subject of the bachelor thesis is to solve the crisis situation of parking at the Dukovany Nuclear Power Plant. Parking areas in front of the company are still the same, but the number of cars is growing rapidly. Therefore, the power plant management decided to solve this situation. Two nearly identical parkades were designed for this area to cover the capacity of 1572 parking spaces. It is a simple design of a 5-storey prefabricated building made of reinforced concrete columns, beams, SPIROLL panels and other elements. For better bracing of the building, the vertical communication cores were designed as monolithic reinforced. The façade of the building consists of a suspended structure fitted with expanded metal, which will help with incoming light and also with the exchange of degraded air in the garages. On the first floor there is a parking space for 142 cars, of which 4 are parking stalls for charging electric cars and 10 stalls for designated handicap parking, all these stalls are located only on the ground floor for easier access of the car owners. In addition to these parking stalls, there are three vertical communication cores with staircases and elevators. At one communication core is also a sanitary facility with toilets for men, women, for people with disabilities and cleaning room. Two ramps are designed for vertical crossing of cars in the middle of the ground plan. Self-service washing boxes and utility room were designed according to requirements. The second and subsequent floors are identical. There are 161 parking stalls on each floor, 4 of them are for charging electric vehicles. There are also sanitary facilities and a utility room. For the safety of pedestrians, the entire parkade is marked with horizontal roads, thanks to which the employees get from their cars to the communication core and out of the building.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.